Construction site: New Material Recycling Industrial Park of High Tech Zone of Ankang
Project content: It is planned to build a thermal power production line with an annual output of 1500 tons of vanadium pentoxide and 15MW+2 * 25MW. In the first phase, a 1x75 t/h roasting unit will be built, equipped with a 15MW waste heat extraction condensing unit, with an estimated annual output of 300 tons of vanadium pentoxide, 90 million kilowatt hours of electricity and 600000 tons of high-pressure steam; In Phase II, 2 * 130 t/h roasting unit will be built, and 2 * 25MW waste heat extraction condensing unit will be equipped. It is estimated that the annual output will be 1200 tons of vanadium pentoxide, 310 million kilowatt hours of electricity and 1.9 million tons of high-pressure steam. After the completion of the project, it is estimated that the annual output value will be 650 million yuan, the annual taxes will be 30 million yuan, and 250 people will be employed.
Total investment: The total investment of the project is 500 million yuan.
Cooperation mode: sole proprietorship or joint venture.